Tuesday, 2 May 2017

AS2: Task 5: Produce a Music Video





Produce a Music Video


Here is the final product for my music video - lip syncing to Christina Grimmie's; "Feelin' Good":


Friday, 7 April 2017

AS2: Task 4: Pre-Production Planning





Pre-Production Planning

Proposal
Prepared by

Jasmine King


I am going to be filming a music video for the song; "Feelin' Good" by singer; Christina Grimmie. The video will be aimed towards teenagers - young adults (roughly aged 16-25) as most of Grimmie's fans seemed to fit into this age group. My group and I have discussed how and when we will be filming the music video. Below is a rough explanation of what the video will include.
  1. The video will firstly portray the protagonist with her best friend having fun in a park.
  2. The video will then cut to the protagonist standing facing the camera and singing the song to the audience.
  3. Throughout the video these shots will continuously show the two friends having fun.
  4. The protagonist will receive a message from her friend asking her to go on a night out with her.
  5. There will be a scene showing the pair meeting up and looking through a wardrobe to find clothes. This is when the two will miss their bus.
  6. Since there isn't anything good to wear, a scene will show the two friends going shopping to find new clothes.
  7. Another scene will show how the friends eventually catch their bus. 
  8. There will be a scene showing the pair putting on their make up and  getting ready to go out.
  9. Scene cuts to the pair having fun on their night out and this is when the music video will finish.


Production Budget


Item
Cost

  • Camera
  • Tripod
  • Boom Pole

  • £75.00
  • £50.00
  • £35.00


Total
£160.00



Shooting Schedule
Day
Scene
Location
Equipment
Costumes
Props
Cast +Crew
1
1
Music room
Camera,
Tripod,
Boom Pole

  N/A
Umbrella/
Shoes/
Coat
(maybe)
Jasmine +
Allegria

2
2
Park
Camera,
Tripod,
Boom Pole
N/A
Coat
Jasmine +
Allegria




Location Visit Sheet

Programme Title: Feelin' Good
Client: 
Writer: Writer of music video : Jasmine and Allegria
Producer:
Director:
Date: 

Rough Sketch/Explanation of location and key points to note:
  • Goodmayes Park (maybe)
  • Central Park
Access to location via: 
  • Bus
  • Walk
Name and number of location contact:
  • Music room - All Saints Catholic School (possibly): 0208 270 4242 - Terling Road, Wood Lane, Dagenham RM8 1JT
  • Goodmayes Park (maybe)
  • Central Park?


 Health and Safety Issues to note:
  • Overcrowded areas - be aware

Potential Filming Problems :
  • Weather
  • Busy area


Additional Notes:  (map of area/weather forecast etc)

A map of All Saints Catholic School and Robert Clack School






Production Schedule
Call Sheet

Programme Title: Feelin' Good
Client: 
Writer: Writer of music video: Jasmine and Allegria
Date: 20/02/17
CREW: Jasmine + Allegria

Camera: Allegria + Jasmine

Production Assistant:

Sound: N/A

Props: N/A

Others: N/A

Meeting at: Robert Clack School

Location Venue: Central Park

CALL DATE: 20/02/17

CALL TIME: 11:00am

Transport: Walk

INSTRUCTIONS: 

N/A


Actors: Allegria + Jasmine  

Make – up: Jasmine & Allegria

Wardrobe: Dressing ourselves

Location Catering: Shops

Notes: N/A



Production Schedule
Cast and Crew Contact Details

Programme Title: "Feelin' Good" Music Video
Client:
Writer: Group
Date:


Name/Role
Mobile Telephone Number
Home Telephone Number
Jasmine/Camerawoman/Actress
Allegria/Camera woman/Actress




Shared among group members.







Shared among group members.


Contingency Plan
Name: Feelin' Good Music Video

Production:

Potential problems and how to overcome these problems:

We plan to film in Southend as part of our contingency plan. We would have the same idea as our original plan, however the location would just be different and some scenes would be filmed elsewhere - for example, park scenes would be filmed on the pier or on the sand.




Meeting Record Sheet
Date: 25/1/17      Time: 12:40pm      Place: Central Park

Present: Jasmine, Allegria

Apologies for absence:  N/A

Minutes recorded by: N/A

Agenda:

To meet at Central Park for 12:40pm. This target was met.
Minutes: 


Minutes/hours recorded for totalled to: 1 hour 35 minutes.


Risk Assessment

Group Members: Jasmine, Allegria     Location: Central Park
Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
Walking/bumping into people
 40+
2
2
2
Go to an area with less people
Y

Contacts

Emergency Contact: 999
Robert Clack School: 020 8270 4200 
All Saints Catholic School: 0208 270 4242 


Shot List

Scene
Shot Number
Description
1  





2







3







4





5




6




6




7
 1

                          



2







1







1





1




1




2




1
This scene was shot all the way through in one take.




This scene was shot all in one take - like the first scene, however this time the camera was placed at a different angle.




This scene was filmed by the swings - showing two best friends having a good time talking to each other.




Shot at the park, it demonstrates the two friends on a swing set that rotates, having a fun time.



This scene will then cut back to the protagonist singing to the camera.


This scene demonstrates the two friends going out to find new clothes to wear.


The pair buy new clothes and plan to go back home but they miss their bus.



The two go home and put their make up on and get ready to go on their night out.


Costumes and Props

Character Name: Jasmine

Costume (DAY 1): Black cardigan, black trousers, black shoes and a white blouse.
Props: Drums
Character Name: Allegria

Costume (DAY 2): Blue bomber jacket, black trousers, black shoes and a white top.

Props: Light stands
Character Name: Jasmine
Costume (DAY 3): Black bomber jacket, black shoes, black jeans and a green top.
Props: N/A